Friday, February 4, 2011

Notes from meeting with Dr. Lindner

Topics that were discussed at Thursday's meeting with Dr. Lindner:

1) Ideas for latrine building
2) Post-assessment forms and phone interview
3) Future meeting dates


Dr. Lindner's suggestions/what we learned from the meeting:

1) Present latrine ideas to SC with a powerpoint.
2) Set up a skype date with Polin and Soknay, schedule before meeting with Richard.
3) Target for Assessment trip is December.
4) Photojournalism students will soon be paired up with our team to document our progress.
5) Dr. Lindner will be available to participate in the post-assessment phone interview.

Also, remember that Banquet is April 6th at 6:00PM in Emerson Alumni Hall.

Tuesday, February 1, 2011

News from the first week of February

Last Sunday's meeting was general in nature. We discussed a couple of events that we have this week- rebuilding the biogas digester with Jon on Tuesday and the lunch meeting with Dr. Lindner on Thursday.

This morning, Sarah, Laureen, Ashley, and I met at the Energy Park with Jon to deconstruct and begin reconstructing the biogas digester. A few improvements were made to the initial design: we raised the digester more to improve ease of input and output flows, used inner tubes in place of tape when attaching the bag to the PVC pipes, and secured the pipes to the bag by wrapping the bag around the outside of the pipe to prevent the bag from clogging up inside of the pipe. Thanks again, Jon, for letting us help out!

Thursday we will be having our meeting with Dr. Lindner at 11:30 AM at the Arredondo Room in the Union. Please remember that we are meeting at 11:00 AM in front of the Arredondo Room to prepare ourselves.

Also, please remember to read the Post-Assessment forms and research/do whatever it is that Sarah assigned for you to do in her email from 1/30/2011.

As usual, we will be meeting at 8 PM this Sunday in the normal spot.

Sunday, January 23, 2011

Notes from 1/23/2011

The night's to-do list:

1) Pre-semester forms

2) Post-assessment forms

3) Email Joshua Knight

4) Professional mentor interest

These goals were mostly accomplished. Also, we discussed ways to improve the speed of our project. We will start having regular, weekly meetings. During the week, we should research latrines and bring something new to discuss at every meeting. Begin building.

Reminders:

Everyone fill out the doodles that David sent! Also, brainstorm outside-of-meetings group bonding events!

Sarah: (1) set a date for meetings (2) find a place we could begin building- ask Mark, Dr. Linder, Dr. Wilkie, and/or farmer? (3) contact Jon to ask about the mentor section of the post-assessment forms (4) research procedures for getting money (5) research closing out project and if we need to do such (6) In the 512, should we talk about what we've done with our grant? Ask Mark and/or Dr. Linder.

Friday, January 7, 2011

Notes from 1/6/2011

Hey Team!

Here are the notes from last night's meeting along with a short list of people and what they need to work on as a reminder at the end:

  • Pour-flush latrine - cost effective; adequate water? (ask Polin)
  • Tube is a few feet away from the digester
  • Squatting plate - expensive - how to reduce cost? (ask Polin)
  • VIP latrine - net keeping mosquitoes out
  • No light on plate or down tube
  • How can we help people who can't afford a digester? Offer a composting or stand-alone latrine; design a stand-alone latrine that could be easily converted to a biogas latrine if family were to later obtain a digester.
  • Earthbags as stairs (rice bags filled with dirt)- *advantage: clay and dirt dug up for latrine can be used in the bags
Characteristics:
  1. Raised to accommodate flooding
  2. Piping: elbow or straight
  3. Pour for biogas latrines
  4. Opening at top for ventilation
  5. Privacy wall- entrance should not face W or E
  6. Thatched roof, possibly with metal sheet underneath
  7. Stand-alone: double chamber, straight pipe, same infrastructure
Reminders:
Sarah- contact Columbia; return "Comparing Biogas Digesters" email?
Jon- finish Post-Assessment forms
David- email Polin about the following items:
(1) NBP and SC model breakdowns
(2) Squatting plate varieties
(3) Cost of rebar, barbed wire, and metal sheet

Monday, July 19, 2010

Greetings From Pursat






Dear team,

Jon, Dr. Wilkie and I have been in Pursat since Friday and we've been well on our way to assessing the areas. We're actually about to leave in a little to finally assess the villages which could just possibly be our potential target areas. Thursday was scheduled as a rest day, but we had adjusted to the jet-lag relatively well and so decided to see what there is to see in Phnom Penh. We visited the Royal Palace, Silver Pagoda, Russian Market, and the eye-opening Killing Fields to name a few. It definitely helped us obtain a better sense of Cambodia's past, both ancient and recent. On Friday we drove to Pursat and upon arriving, were able to briefly meet the whole SC family. We were able to see how it all works. It's much more complex than I expected, and it seems that the whole organization is very ambitious and everyone is very dedicated to the organization's goals.

On Saturday, we visited 3 digesters built through the National Biogas Program (NBP), a government program which installs underground, continuously fed half spherical digesters made of brick and cement for those families who qualify (enough funds, enough manure). One was being built and two were already built. Two were 4 cubic meters and one was 8 cubic meters. The both that were already built have been in operation for about 2 months, and both families state that they would never go back. For the families who have had them already constructed, one fed it with 4 cows and 2 pigs, while the other family fed theirs (8 cubic meters) with manure stemming from about 35 pigs. The latter actually had a surplus of biogas! These models worked very well from what we saw, and the families were impressed as well. Dr. Wilkie and Jon did the scientific fun stuff of testing pH, electroconductivity, and methane content while I sat and observed. The apprentice will become the master. However, this all comes to a cost. For even the smallest digester, a family still has to fork up $300, and so only the well off can qualify. This obviously does not meet our target audience, since rural Cambodians, according to Sok nay, definitely cannot afford this price. Although this may be the case, we know there is a seemingly solid program advancing here in Cambodia.

Yesterday we checked the markets here in Pursat, and concluded that there are ample supplies to build pretty much whatever we wanted, not including polyethylene bags.

This morning we met with the government official heading the NBP for the Pursat province and got a boatload of very useful information. The program has reached the Pursat province recently, beginning in October of last year. Although only 21 digesters have been built in Pursat, over 8,000 have been built in all of Cambodia through the NBP. We received the breakdown of cost for the digesters including materials, equipment, and labor, and even got ourselves some souvenirs to bring back to the states (a couple rice cookers, pressure meters, biogas stoves, biogas lamps, etc). There is plenty more information that we can fill you all in on once we meet up to debrief in the fall.

While it was certainly important to see how biogas is already being implemented in Cambodia, our assessment of the villages themselves is what will allow us to come to our final conclusions on how to move forward with this project. One thing to note is that Sok nay has visited plastic bag digesters in another province which have failed, and state reasons for failure being maintenance (have to be replaced once or twice a year), disruption by animals (chickens making nests, cats having their own fun), and poor accumulation of waste. Just something to consider while we search for the best solution for this project.

I'm sure there is much that I have forgotten, but you will be filled in once we all get back. I'll update again as necessary. Hope all your summers are going well!

David

Tuesday, June 8, 2010

Vaccinations

I just got back from the satellite office of the UF Student Health Care Center at Shands (room D2-49 on the second floor of the "Dental Tower"--352-392-0627-- a little confusing to find, allow 5 minutes of wandering around to find it). The travel nurse recommended some vaccinations and precautions for me (Disclaimer: it was individual medical advice for me, and may differ for you, and you should definitely go to hear the specific tips she had):
  • Malaria chemoprophylaxis: Specifically atovaquone/proguanil (Malarone) or doxycycline. I chose Malarone, although it's the more expensive choice, because of the photosensitivity side effects of doxycycline. Both have to be taken daily, 2 days before, during, and 7 days after the trip. For that reason I chose to get 20 doses. (also strongly recommended taking it when you'll be upright for a few hours, because it can get into your esophagus while sleeping and eat away at it)
  • Typhoid vaccine: can be administered via shot or oral doses. I chose oral because it lasts a little longer (5 years), but you need to keep it refrigerated and take it every 2 days on an empty stomach for about a week. The shot needs to be given at least 2 weeks before travel.
  • Hepatitis A: She strongly recommends that everyone get this regardless of where they're going. It is 1 shot for temporary immunity 1 month before travel, and one may get another 6 months later for long lasting (15 yrs or so) immunity.
  • Traveler's Diarrhea: She prescribed me an azithromicin (spelling?) antibiotic in case of a debilitating infection. But strongly emphasized proper precautions for food, drink, and hand washing.
  • She strongly recommended the use of 30-50% DEET insect repellents for the skin, and permethrin insecticide for clothing. I'll be picking up both sometime soon.
  • She did not recommend Japanese encephalitis since we will have improved sleeping conditions, and against rabies since it is over $400 for the preventative series.
  • She warned of Dengue Fever, which does not have a vaccine or curative treatment. It resembles malaria in symptoms, so you should go to the doctor when back home. It isn't dangerous, but will ruin your week.
I can talk more about the food/water/etc. precautions, but you'll hear them when it's your turn to see a travel medical specialist so I won't waste the time.

I also picked up some forms for the MEDEX service at the International Center. I apparently get the service for free through Gator GradCare, so I have my own form. David and Dr. Wilkie will need to fill out the MEDEX forms. She suggested that if Dr. Wilkie was billing SWS that she contact a person in the IC for whom I have a business card. They also do not offer travel insurance, but recommended that we speak to Scarborough... who have a local office that is used to dealing with short trips from the University.

Cheers!
-Jon

Thursday, June 3, 2010

Efficient Stove

Hey team,
Yesterday, Jon, David and I made what we hope is an efficient stove. We mixed clay from the ground with water and sand. We didn't include any hay or grass, which is suggested for structural support. We wanted to see how the clay stays up without this.





This is the mold we made. We used 4 tall thick pieces of wood, cinder blocks for support and PVC piping for inlet of wood and container of fire. We are storing our stove underneath the covering near Dr. Wilkie's office.
Then we filled it up with the clay, patted it down and are waiting for the clay to dry. Depending on the weather, it'll take anywhere between 1 week to 3 weeks.







Also our phone interview is today with Joshua Knight for our assessment trip. Information on how that went will be posted later.
Here's a checklist for the traveling team to remember to do:
1) Vaccinations
2) MEDEX
3) Personal Health Form
4) Checklist for items taking on trip
5) Purchase tickets
6) Arrange final travel plans with Soknay and Priya

Sarah Grace Katz